In defence procurement, where complexity and high stakes are the norm, project success depends on robust management systems. To ensure that projects remain on track, within budget, and aligned with their objectives, the UK’s Defence Equipment & Support (DE&S) relies on a structured framework of Project Controls.
Level 2 Project Controls provide a streamlined yet effective system of oversight, ideal for projects that don’t demand the full rigor of Level 1 but still require structured management. This approach strikes a balance between comprehensive control and operational efficiency, ensuring that medium-risk and moderately complex projects are managed effectively without imposing an unnecessary reporting burden.
In this guide, we’ll dive into the features of Level 2 Project Controls, their strategic advantages, and how contractors can leverage them for optimal project performance.
What is Level 2 Project Control?
Level 2 Project Controls are designed for Category A and B projects that require a moderate level of oversight. While the framework still leverages Earned Value Management (EVM) to track performance, the reporting requirements are significantly reduced compared to Level 1.
This makes Level 2 perfect for projects with budgets typically in the £100M to £400M range. These projects benefit from structured performance management without the administrative complexity of full EVM implementation, making it easier for both DE&S and contractors to focus on delivering results.
Key Features of Level 2 Project Controls
1. Earned Value Management (EVM) with Reduced Reporting
Level 2 uses EVM to monitor project performance but with fewer reporting requirements. Core metrics like:
- Cost Performance Index (CPI)
- Schedule Performance Index (SPI)
are still tracked, providing vital insights into project health. However, contractors can focus on essential data points, reducing the reporting load while maintaining effective oversight.
2. Work Breakdown Structure (WBS)
A detailed Work Breakdown Structure (WBS) is mandatory, but its complexity is scaled to fit the project’s needs. This structure breaks the project into manageable components, ensuring clear allocation of tasks, resources, and costs.
3. Integrated Baseline Review (IBR)
Level 2 projects still require an Integrated Baseline Review (IBR) to validate the project’s baseline. This ensures that the Performance Measurement Baseline (PMB) is both realistic and achievable, aligning all stakeholders on cost, schedule, and scope from the outset.
4. Risk and Opportunity Management
While less intensive than at Level 1, risk management remains a key component. Contractors are expected to maintain a Risk and Opportunity Management Plan (ROMP), with regular updates to the risk register. Tools such as Schedule Risk Analysis (SRA) and Cost Risk Analysis (CRA) are applied proportionately to the project’s complexity.
5. Subcontractor Management
For projects involving major subcontractors, Level 2 requires appropriate oversight. Subcontractors may not need to implement full EVM systems, but their performance is still closely monitored to ensure alignment with the main contract. This flexible approach allows for tailored oversight based on the subcontractor’s role and the complexity of their deliverables.
Why Choose Level 2 Project Control?
Level 2 Project Controls are ideal for projects that sit between low-risk and highly complex ventures. Here’s why:
1. Moderate Complexity and High Value
Projects in the £100M to £400M range with moderate technical challenges benefit from Level 2. These projects need robust management but don’t warrant the exhaustive controls of Level 1.
2. Predictable Costs
Level 2 works well for fixed-price or firm-price contracts, where cost predictability reduces the need for granular financial oversight.
3. Efficient Risk Management
Level 2 provides enough structure to manage risks effectively without the intensive reporting required for high-risk projects.
Benefits of Level 2 Project Controls
For DE&S and industry partners, Level 2 offers several advantages:
1. Efficiency in Reporting
Reduced reporting requirements save time and resources, enabling contractors to focus on core project deliverables.
2. Flexibility
Contractors can tailor their reporting and risk management processes to the project’s specific needs, avoiding unnecessary administrative burdens.
3. Strong Risk Mitigation
Level 2 ensures risks are actively managed, helping to prevent potential issues from escalating into costly problems.
4. Scalable Oversight
The flexibility of Level 2 allows DE&S to adapt controls to fit each project’s unique risk profile and complexity, fostering efficiency without sacrificing accountability.
How DE&S and Contractors Can Leverage Level 2 Controls
To make the most of Level 2 Project Controls, contractors must understand and implement its key features effectively. Here are some best practices:
1. Understand Reporting Requirements
Familiarise your team with the reduced reporting structure. Focus on delivering high-quality data for key metrics like CPI and SPI, while avoiding unnecessary complexity.
2. Proactive Risk Management
While risk reporting is less intensive, a proactive approach remains crucial. Regular risk reviews and updates to the risk register ensure risks are identified and mitigated early.
3. Collaborate on Integrated Baseline Reviews (IBRs)
Use the IBR process to align with DE&S on performance baselines. Open communication ensures everyone is on the same page, minimising potential discrepancies.
4. Tailor Subcontractor Oversight
Adjust oversight based on the complexity and value of subcontracted work. For smaller or less complex contracts, simplified reporting may suffice.
Optimising Level 2 for Maximum Impact
To fully capitalise on the benefits of Level 2 controls:
- Leverage EVM to Drive Insights: Use EVM data to monitor project health and make informed decisions.
- Streamline Communication: Regular updates between DE&S, contractors, and subcontractors ensure alignment on goals and performance.
- Stay Adaptable: Work with DE&S to tailor controls to the project’s specific needs, ensuring oversight remains efficient and effective.
Conclusion
Level 2 Project Controls offer a powerful yet flexible framework for managing moderately complex defence projects. By balancing structured oversight with reduced reporting, Level 2 ensures projects remain on track without unnecessary administrative burden.
For contractors, mastering Level 2 controls means delivering high-value projects efficiently while maintaining strong risk management and performance tracking.